- Evidence
- Label quantities as measured, estimated from photos or unknown.
- Materials
- Disturbing paint in pre-1978 housing can trigger EPA renovation requirements. 1
What should the field note actually say?
Describe only what you observe from a lawful location. A useful roof note says that shingles are missing from part of the rear slope and the fascia appears displaced near one corner. A statement that the roof deck is rotten throughout exceeds the evidence. Attach the image date, orientation, source and whether the entire area was visible.
List unresolved causes beside the visible condition. Damage could be localized or prolonged water intrusion could require a broader repair. Avoid assigning probabilities without evidence. Ask a qualified contractor to price distinct work descriptions and identify the inspection needed to choose between them. A fixed allowance for something described only as roof issues gives the estimator little basis for disagreement.
How do you ask for comparable bids?
Send each estimator the same images, project facts, quantities and access restrictions. Request assumptions for tear-off, replacement material, flashing, disposal, decking unit rates, permits and related interior restoration. Identify who will verify quantities once access is lawful. Compare costs for a shared scope before comparing bids.
Describe building age and affected painted surfaces. EPA explains when its Renovation, Repair and Painting rules can apply to work that disturbs painted surfaces in pre-1978 housing. Ask about applicability, certification and containment for the particular scope, together with local requirements. An exterior photograph cannot determine that a material contains lead. 1

What does one roof defect do to the bid ceiling?
Consider a project that could support a $150,000 bid under the limited case with no percentage premium. The expanded scope reduces the ceiling by $11,000 to $139,000. If the work adds two weeks of carry at $65 a day, subtract another $910. The revised ceiling becomes $138,090. These amounts illustrate the decision and are not regional contractor quotes.
If six additional sheets are documented at an assumed installed unit price of $140 each, the change request is $840. That quantity addresses one revised component. It does not prove that all of the expanded scope occurred. Reconcile the completed work, units installed and evidence required by the loan before requesting a draw. 3
| Hypothetical quote component | Limited repair | Expanded scope |
|---|---|---|
| Roofing labor and material | $7,800 | $13,200 |
| Decking and finish allowances | $1,500 | $6,400 |
| Permits, disposal and staging | $1,200 | $1,900 |
| Roof-related total | $10,500 | $21,500 |
Which finding triggers a revised scope?
Write conditional language into the estimate. For example, the base scope may include a defined number of decking sheets. Additional damaged sheets require photographs, a measured quantity and an agreed unit price. Identify who can authorize that change, what supporting evidence is required and which lender approval may be needed.
Check for costs outside the trade estimate. A roofer may repair the envelope while the interior contractor separately addresses the ceiling, insulation or damaged finishes. Staging, drying and inspection affect when the next trade can begin. If the lender requires a revised draw schedule, include that process before committing to the next invoice. 3
What can you measure from the sidewalk?
Record roof planes, visible edges and approximate building dimensions only where the vantage and public information support them. Measurements inferred from a photograph can be distorted by slope, camera angle and overlapping additions. Label them as estimates and tell the contractor whether the rear or an extension is entirely out of view. Never enter a porch, fenced yard or building simply because a listing lacks interior photos.
If an aerial image helps establish footprint, record its date. Recent additions, reroofing or storm damage may postdate the image. Ask for separate pricing to inspect once authorized and for an assumption about pitch, access equipment and waste. The resulting budget should show which dollars respond to area and which are fixed mobilization expenses.
Which evidence supports a roof draw after work starts?
Confirm what the lender will accept for completed roof work before ordering material. Ask the contractor to break out installation, decking and related interior repairs on the invoice. Preserve authorized photographs and inspection or permit approvals as required. Payment for shingles sitting at a supplier can be treated differently from payment for installed roofing under the draw agreement. 3
If additional decking is approved, attach the authorized change, dated measurements and price per sheet. Mark how much of the original allowance has already been used. Otherwise a change request for six sheets can inadvertently include sheets the original contract already paid for. Reconcile approved amounts, actual contractor payments and requested reimbursement on one trade sheet.
Could a more expensive repair fail to increase resale value?
Yes. A buyer may reasonably expect a dry, functioning roof at the price already assumed in the comparable sales. Replacing damaged decking can be necessary to reach the modeled property condition without adding a premium above it. Do not increase expected resale value dollar for dollar merely because the hidden repair costs more.
Ask a local valuation professional whether the comparable properties already had similar roofing and finishes. If they did, treat the additional repair as a cost needed to deliver equivalent condition. If the replacement materially changes the finished specification, document sold evidence before revising value. That discipline keeps a scope increase from disappearing in the model through an unsupported increase in projected sale proceeds.
How do you present a conditional budget to a lender?
Attach a base scope and an expanded scope with the same trade categories so the reviewer can see why they differ. Mark any unsupported allowance and describe which inspection would narrow it. In the roof example, labor to replace the covering is priced in both cases. Additional decking and interior finishes account for the hidden-condition allowance.
Ask the lender which scope it underwrote and how a documented change would affect approved proceeds. A borrower who submits only the smaller scope could have to fund the full difference if damage later appears. Explain how the buyer would pay the difference during the interval before any approved change reaches the draw account. Request written instructions for a change order rather than assuming a larger invoice creates a larger loan. 2 3
When is a contractor allowance worth refining before bid day?
Measure the value of resolving the uncertainty. In the roof example the gap between scopes is $11,000 before delay. If the seller permits an authorized inspection for an assumed $450 and the result can reliably narrow the spread by several thousand dollars, that inspection could materially change the bid decision. If interior entry is prohibited, offer no inspection savings in the model.
Also ask whether information would actually change your action. If the opening bid already exceeds the ceiling even with the limited repair, paying for an estimate is unlikely to help. If the price falls between the two ceilings, a documented decking assessment, verified roof dimensions or a firm installed-unit price can make the difference between bidding confidently within budget and passing.
What can go wrong with a photo-based estimate?
The photo may show an older roof, cover only the front slope or include a garage on a neighboring parcel. Check its source and date against the listing and records. Treat missing images of a mechanical room or roof valley as missing evidence. A house can have an expensive concealed defect despite looking intact from a sidewalk.
Another failure is using a contractor's low preliminary allowance in the financing file while privately assuming final cost will be much higher. Present the alternate scope and potential funding gap to the lender. A photo-funded review, where available, does not turn an estimate into a fixed price or approved change order. 2 3
Frequently asked questions
Should I apply one contingency percentage to every unseen room?
First model credible alternatives for the expensive unknowns, including common causes that might affect several rooms. A general contingency can supplement the analysis but cannot make an unbounded structural risk affordable.
Can I treat the contractor’s first verbal price as a binding bid?
Ask what the price includes, how long it is valid, which quantities are assumed and how the contractor determines a change. Document the answers before relying on the estimate.
What if a contractor cannot price the alternative without interior measurements?
Seek authorized access where possible. If no credible upper scope can be supported before bidding, the uncertainty may exceed what the buyer can absorb.
Sources and editorial review
Published by Jaken Finance Group on . Sources last checked .
Editorial contact: Jason Taken, Principal. Editorial standards and corrections.
Have a property in mind?
Send the sale terms, bid and payment deadline to the JFG lending team.