Maximum bid
Illustrative only, not a quote or commitment. Change the example inputs to match the sale and your written terms.
- Highest whole-dollar bid
- $155,047.00
- 70% rule comparison
- $136,000.00
- Profit at maximum bid
- $25,000.92
- Bid limit
- Target profit
- Loan limit at this bid
- Cost ceiling
- Acquisition cash required
- $33,257.05
How is the estimate calculated?
Find the highest whole-dollar bid for which resale proceeds less purchase, premium, repairs, carry, fees and selling costs still meet the target profit.
Worked example
With a $25,000.00 target, the highest whole-dollar bid is $155,047.00. At that bid the modeled profit is $25,000.92. Raising the bid one dollar gives $24,999.83. The 70% shortcut gives $136,000.00.
How sensitive is the result?
Each row changes one assumption. A repeated result means that input does not affect the displayed measure.
| Change | Highest whole-dollar bid |
|---|---|
| Base case | $155,047.00 |
| ARV −5% | $142,979.00 |
| ARV −10% | $130,911.00 |
| Rehab +10% | $149,322.00 |
| Rehab +20% | $143,598.00 |
| Hold +2 months | $151,605.00 |
- Bid base
- The amount you call or enter at auction
- Profit target
- Dollars retained after modeled project costs
- Next check
- Available settlement funds at the proposed bid
Which sale price belongs at the top of the calculation?
Use a resale price supported by closed comparable sales in the condition you expect to deliver. Compare usable area, room count, site and finish level. An asking price from a fully renovated house can inform the competition your listing will face. A completed transaction gives you evidence of what a buyer actually paid.
Record any concession that changes the comparison. If your exit assumption already deducts an expected seller credit, avoid charging the same credit again in selling costs. Keep the price and the itemized deductions on the same worksheet so you can revise one assumption without losing the other.
How does the buyer’s premium change the last bid you can make?
A percentage premium makes each increment more expensive than its face amount. With an illustrative 4% premium, adding $5,000 to the bid uses another $5,200 before any added financing costs. Confirm the rate and any dollar minimum on the actual listing. Auction.com describes property-specific premiums and directs buyers to the listing for the applicable charge. 1
Where the auction uses a flat minimum, check the final result against that floor. A percentage entered on a low bid can understate the charge. At the proposed bid, compare the amount the tool deducted with the dollar amount in the sale terms. Reduce the bid and recalculate if the sale requires more.
Which cost assumptions deserve a second bid limit?
Write down the price with the house vacant and ready for work. Then calculate a second ceiling with the acquisition terms you can actually verify. If possession could take another two months, add the associated interest, insurance, tax and utility costs. If the roof quote excludes damaged decking, include a contractor-priced allowance. Give the second run a clear name in your own notes.
Check financing separately. An after-repair value ceiling can reduce the acquisition advance even when the proposed flip still earns the target margin. JFG’s standard loan page explains the interaction of cost, valuation and cash at closing. Set a cash ceiling using your liquid funds, then use the lower feasible bid when the two ceilings disagree. 2
What can go wrong in the final round of bidding?
The next accepted bid increment can sit above an otherwise sensible answer. If a ceiling is $162,400 and the auctioneer requires $2,500 increments from $160,000, your next bid is $162,500. Passing keeps the assumptions intact. Rounding up silently spends $100 of the profit or reserve you chose to protect.
A seller counteroffer after an online event deserves a fresh calculation. The agreement can set the price, premium and funding date differently from your assumptions at registration. Reconcile the contract amounts before deciding whether the revised purchase still fits. 1
Frequently asked questions
Why compare my ceiling with the 70% rule?
The shortcut leaves one broad allowance after subtracting repairs from a fraction of resale value. The detailed ceiling shows the dollars your own financing, taxes and sale expenses consume. Investigate a large difference by checking each assumption. A close match alone says little about the reliability of either resale estimate.
Should a refundable bidding deposit reduce the maximum bid?
Include a deposit forfeiture only in a failure scenario. When a deposit is credited toward the price, it changes the remaining settlement balance. A refundable registration hold can restrict available cash while leaving the economics of a successful purchase unchanged.
Can I enter my contractor’s total if materials are separate?
Add materials, delivery, applicable permits and owner-paid items excluded from the agreement to the contractor’s stated price. Keep the breakdown. A labor-only estimate and an all-in estimate can produce very different bidding ceilings for the same physical project.
Should I count unpaid work I plan to do myself?
Choose the question you are answering. For cash budgeting, enter spending you actually expect. For a comparison with hiring a crew or doing another project, run a separate scenario assigning a value to your own labor and time.
Sources and editorial review
Published by Jaken Finance Group on . Sources last checked .
Editorial contact: Jason Taken, Principal. Editorial standards and corrections.
Have a property in mind?
Send the sale terms, bid and payment deadline to the JFG lending team.
