First-draw cash runway
Illustrative only, not a quote or commitment. Change the example inputs to match the sale and your written terms.
- Extra cash required
- $0.00
- Spendable after closing
- $25,000.00
- After first contractor payment
- $16,000.00
- Immediately before reimbursement
- $2,440.00
- After reimbursement
- $17,440.00
- Lowest available balance
- $2,440.00
- Closing balance of this schedule
- $17,440.00
How is the estimate calculated?
Spendable cash after closing = available cash less protected reserves and remaining wire. Deduct invoices on their due days and daily carry through the later of invoice or draw. Same-day bills are paid before reimbursement. The lowest balance sets additional cash needed.
Worked example
$65,000.00 available − $10,000.00 protected − $30,000.00 wire = $25,000.00 to spend. Pay $21,000.00 in invoices and $1,560.00 in carry before the draw. The pre-draw balance is $2,440.00. The hold sensitivity delays the reimbursement by sixty days.
How sensitive is the result?
Each row changes one assumption. A repeated result means that input does not affect the displayed measure.
| Change | Extra cash required |
|---|---|
| Base case | $0.00 |
| ARV −5% | $0.00 |
| ARV −10% | $0.00 |
| Rehab +10% | $0.00 |
| Rehab +20% | $1,760.00 |
| Hold +2 months | $1,460.00 |
- Opening cash
- Available balance after previously paid earnest money
- Protected cash
- Amount that must stay unspent
- Reimbursement
- Use the expected cleared amount and day
Which balance goes into the opening cash field?
Take a dated snapshot of actual available funds after earnest money has left the account. Exclude a pending transfer or a refund that is still being processed. Use the remaining buyer settlement wire already net of any confirmed earnest credit. This keeps a previously paid deposit from being deducted a second time. Verify the closing figure against the lender’s acquisition advance and the settlement agent’s statement. 1
Identify money that cannot fund construction even though it appears in the same account. Examples include a lender-required reserve, tax payment earmark or an obligation to another project. Enter the protected amount once. If you start from a balance that has already excluded those dollars, do not subtract them again. Record the snapshot date so you can update the model when the real settlement amount becomes available.
Which contractor invoice should you schedule for day zero?
Use the first actual payment due as the project begins, such as a signed mobilization deposit or an owner-supplied material order. It can be due before enough work exists to pass a milestone inspection. Enter the later invoice on its own stated due day and include the daily ownership costs until the reimbursement reaches the bank. The timing of money is distinct from whether the repair is ultimately eligible for a draw. 2
Ask the contractor what happens if access is delayed. A crew deposit could be transferable, refundable or earned once a slot is reserved. A no-access purchase can leave demolition scope uncertain, and an electrician may need a separate payment before the original milestone is complete. Replace assumed dates with the actual contract schedule and run a second case for a delay.
How can a reimbursable job still run short of cash?
Suppose $72,000 remains available after your credited deposit has already been paid. Protect $12,000 of reserves and send the remaining $37,000 settlement wire. There is $23,000 available for work and carry. A day-zero contractor payment of $14,000 leaves $9,000. Another invoice for $7,800 before reimbursement reduces the cushion to $1,200 before daily expenses.
At an assumed $100 per day over fifteen days, ownership costs total $1,500. If both invoices must be paid before a day-fifteen reimbursement, the cushion reaches negative $300 immediately before reimbursement. Even a subsequent $16,000 draw, lifting the modeled balance to $15,700, cannot pay an overdue invoice retroactively. Obtain the bank’s actual credit timing if bills and the draw fall on the same day.
What can go wrong between draw approval and usable cash?
A draw request, inspection, approval, outgoing wire and cleared account credit are separate events. JFG describes progress evidence, invoices and inspection in its draw process. Use the day money should actually be available. Price another run with delayed evidence, a contractor change order or a reduced approved amount. Contract fees or holdbacks can reduce what arrives relative to the invoice. 2
When the available balance turns negative, identify the earliest day and amount. A surplus at the end of the modeled period can hide an earlier shortage. Look for an agreed billing schedule, additional unrestricted capital or a smaller acquisition commitment before bidding. A larger total loan does little for the shortfall if the draw still requires the same completed milestone.
Frequently asked questions
What if earnest money has cleared my account but was omitted from the closing statement?
Resolve the discrepancy with the settlement agent. Use actual available cash after payment as the opening balance. Deduct the closing wire once it reflects the verified treatment of the deposit. Never assume the missing credit will appear before the wire deadline.
Should I enter the first draw request day or wire day?
Use the expected day of usable bank credit. A request or inspection can occur earlier. If the credit time on that day is unknown, test the case where the contractor and carry obligations leave the bank before reimbursement arrives. 2
How should I treat a second contractor bill due after the first reimbursement?
Put the real due day into the worksheet and examine the model’s stated horizon. If the bill falls beyond the displayed first-draw period, carry the closing balance forward and model the subsequent payment separately. The first draw can restore cash while leaving a later shortage.
Does a negative spendable balance mean my bank account itself is overdrawn?
It means expected payments have used more than the cash left after protected reserves in the scenario. Your bank may still show reserved funds. Treat the result as a project funding gap and confirm which reserves must remain intact.
Sources and editorial review
Published by Jaken Finance Group on . Sources last checked .
Editorial contact: Jason Taken, Principal. Editorial standards and corrections.