Rehab budget
Illustrative only, not a quote or commitment. Change the example inputs to match the sale and your written terms.
- Rehab budget with contingency
- $59,800.00
- Scoped work
- $52,000.00
- Contingency reserve
- $7,800.00
- First-draw cash float
- $10,400.00
How is the estimate calculated?
Scoped work = quantity × contractor unit price + systems + other work. Budget = scoped work × (1 + contingency rate). First-draw float = scoped work × share paid before reimbursement.
Worked example
1200 units × $20.00 + $18,000.00 systems + $10,000.00 other work = $52,000.00. Add $7,800.00 contingency for a $59,800.00 budget. The $10,400.00 first-draw float is part of that work.
How sensitive is the result?
Each row changes one assumption. A repeated result means that input does not affect the displayed measure.
| Change | Rehab budget with contingency |
|---|---|
| Base case | $59,800.00 |
| ARV −5% | $59,800.00 |
| ARV −10% | $59,800.00 |
| Rehab +10% | $65,780.00 |
| Rehab +20% | $71,760.00 |
| Hold +2 months | $59,800.00 |
- Base scope
- Measured quantity multiplied by quoted unit cost
- Contingency
- Allowance for uncertainty in the stated scope
- Draw float
- Cash needed before eligible work is reimbursed
How do you turn a photo into a priced line item?
Describe what can actually be seen and date the image. For a damaged ceiling, note the rooms affected and the estimated finish area. Ask the estimator to separate containment, removal, disposal, underlying repair, finish and inspection. A single square-foot rate for replacing drywall leaves a very different question open if the source of the leak has yet to be identified.
Obtain an all-in unit quote or identify exactly what the unit excludes. For example, 240 square feet at an illustrative $6 per square foot produces $1,440. If delivery and disposal are separately quoted at $310, the scoped line becomes $1,750. These invented prices demonstrate the arithmetic. Use local written estimates for an actual auction.
How should you record work you cannot inspect?
Give each unknown an owner, a verification step and an alternate scope. A photo of a stained floor does not establish subfloor condition. Ask for a base price for the visible finish and a separate price if the subfloor requires replacement. A contractor can sometimes provide both ranges subject to access. Identify items that cannot reasonably be bounded before deciding to bid.
For older housing, some activities that disturb painted surfaces can require trained workers, firm certification and specific work practices under EPA’s Renovation, Repair and Painting Rule. Applicability depends on the building, task and any applicable exceptions. Ask the bidding contractor how the scope and quote address the requirements. Use the agency’s contractor guidance as the starting reference. 1
How much money must be available before the first draw?
Mark the materials and work that must be paid before an eligible milestone, then add invoices due during inspection and processing. Subtract only reimbursements expected to clear before those bills fall due. JFG describes draws tied to work completed and supporting evidence. Confirm the actual milestone wording, inspection and submission requirements in the loan documents. 2
Keep working capital separate from total cost. If a contractor requires $8,000 before mobilization and the first reimbursement follows completed rough-in, the $8,000 consumes cash early even if every dollar eventually qualifies. A modeled contingency does not put spendable funds into the operating account. Allocate a source against each dated cash call.
What can go wrong with a blanket contingency?
A percentage reserve grows with the base scope, so it can look reassuring on an expensive cosmetic project while understating one unresolved structural item. Price large identifiable alternatives separately. Use a general allowance for residual uncertainty after the major risks have been named. Record when an item moves from allowance into approved contracted work to avoid counting both.
Add the schedule impact of each alternate scope to the holding-cost estimate. Opening a wall can produce a permit revision or an inspection delay even when the replacement material is inexpensive. The repair allowance covers construction spending. Loan interest, insurance and utilities for the added weeks require their own budget.
Frequently asked questions
Can a contractor quote serve as both base budget and contingency?
Ask whether the quote contains an allowance, a fixed price or an excluded item. Carry stated allowances inside the base only once. A change-order reserve can remain outside for risks the contractor excluded or that the buyer still bears.
How should I account for leftover materials?
Start with the quantity you must purchase at supplier package sizes, including reasonable waste. Credit a return only when the supplier permits it and the goods are in returnable condition. A theoretical unit cost can understate the original cash order.
How do I handle the first onsite inspection after closing?
Compare actual conditions with the visible-scope and alternate-scope notes. Get revised pricing and identify which milestones or permits change. Ask the lender about written approval before work diverges from the financed scope. 2
Does the renovation allowance also cover contractor deposits?
The scope may include the work while the draw schedule still requires completion before disbursement. Check timing line by line. A bill can be eligible in the final project and still require separate borrower cash when the contractor requests payment.
Sources and editorial review
Published by Jaken Finance Group on . Sources last checked .
Editorial contact: Jason Taken, Principal. Editorial standards and corrections.
Have a property in mind?
Send the sale terms, bid and payment deadline to the JFG lending team.
